Re: Miller Boyington Pit #3 …

ERO number

019-3449

Comment ID

54188

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses

Comment

Re: Miller Boyington Pit #3 from Uxbridge resident on Second Avenue, Uxbridge

Miller must remove their contractor’s yard immediately. There has been inspection and they have been told to remove their contractor’s yard in 2021, 2015 and 2020! They are not in compliance with the removal which should already have taken place.

We do not want fill from the GTA to be put into the Miller pit. The pit is located on a highly vulnerable aquifer within the Oak Ridges Moraine.

The pit needs to be returned to the natural state. This takes time and needs to be started in 2021.

‘Do not pass the buck’ to the Township of Uxbridge to manage. The Township does not have the personnel or experience to effectively oversee an operation like this.