Commentaire
Re: Miller Boyington Pit #3 from Uxbridge resident on Second Avenue, Uxbridge
Miller must remove their contractor’s yard immediately. There has been inspection and they have been told to remove their contractor’s yard in 2021, 2015 and 2020! They are not in compliance with the removal which should already have taken place.
We do not want fill from the GTA to be put into the Miller pit. The pit is located on a highly vulnerable aquifer within the Oak Ridges Moraine.
The pit needs to be returned to the natural state. This takes time and needs to be started in 2021.
‘Do not pass the buck’ to the Township of Uxbridge to manage. The Township does not have the personnel or experience to effectively oversee an operation like this.
Soumis le 22 avril 2021 5:44 PM
Commentaire sur
Miller Paving Limited - Changes to the site plan for a pit or quarry
Numéro du REO
019-3449
Identifiant (ID) du commentaire
54188
Commentaire fait au nom
Statut du commentaire