Commentaire
Thank you for the opportunity to provide comment on ERO 025-1133 and please refer to attached comment letter for our detailed comments. On behalf of the Block 40-5 Landowners Group within the Bram West Secondary Plan Area (40a) in the City of Brampton, we have concerns with the proposed October 2025 refinements to the Northwest GTA Narrowed Area of Interest.
In support of the vision for the future Block 40-5 community, it is our professional planning opinion that the Transmission Corridor should be aligned immediately adjacent to the Highway 413 right-of-way, on the east side of the Trans-Canada Pipeline. Further, best efforts should be made to minimize the width of the future Transmission Corridor, where feasible, to preserve future homes and jobs within the City of Brampton. Locating the Transmission Corridor elsewhere would risk further fragmenting the existing natural heritage system and fragmenting future housing and employment opportunities within Block 40-5.
Documents justificatifs
Soumis le 7 novembre 2025 4:48 PM
Commentaire sur
Affiner un couloir de terres protégé pour les futures infrastructures de transport d’électricité dans le Nord-Ouest de la région du Grand Toronto
Numéro du REO
025-1133
Identifiant (ID) du commentaire
169621
Commentaire fait au nom
Statut du commentaire