Commentaire
Living nearby, exposed for years to high levels of PM10 and PM2.5, with zero remediation or even acknowledgement of responsibility, I have become very skeptical of anything this applicant proposes.
Even with a “closed loop system” how is the water in the “settlement ponds” going to be prevented from leeching into the groundwater, our water source, only 5 feet below the extraction limit? Surely, our drinking water will be adversely affected, as will the nearby Minesing Wetlands.
Obviously, my neighbours and I are strongly opposed to the granting of this application unless and until an application for Certificate of Approval for Air Emissions and approval from Simcoe Muskoka District Health Unit.
Soumis le 17 novembre 2023 3:40 PM
Commentaire sur
Galibier Materials Inc. - Environmental Compliance Approval (sewage)
Numéro du REO
019-7705
Identifiant (ID) du commentaire
94597
Commentaire fait au nom
Statut du commentaire