R.W. Tomlinson Ltd. - Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry

Numéro du REO
019-6776
Type d'avis
Instrument
Loi
Aggregate Resources Act, R.S.O. 1990
Affiché par
Ministry of Natural Resources and Forestry
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 13 mars 2023 au 13 mai 2023 (60 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 13 mars 2023
au 13 mai 2023

Résumé de la proposition

R.W. Tomlinson Ltd. has applied for a licence to operate a pit below the water table in the Township of Horton.

Détails de l'emplacement

Détails de l'emplacement du site

Township of Horton, County of Renfrew

Lot 20, Concession 6, Geographic Township of Horton.

This site is located at 432 Storyland Road, Renfrew, Ontario K7V 3Z8

This site has coordinates at Latitude 45.55° N Longitude -76.67° W.

The site is adjacent to the southeast boundary of Aggregate Resources Act (ARA) Licence No. 17733.

A link to our mapping tool allows you to locate and view licensed sites under the ARA.

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

R.W. Tomlinson Ltd.
100 Citigate Drive
Ottawa, ON
K2J 6K7
Canada

Détails de la proposition

R.W. Tomlinson Ltd. has applied for a Class A licence, Pit Below Water, to excavate aggregate from a pit of 69.5 hectares in size with an extraction area of 55.9 hectares.

This application is for the establishment of a new pit. The annual tonnage condition applied for is 1,000,000 tonnes.

Other information

Sullivan Holdings (Arnprior) Inc. currently operates the adjacent site under the authority of Licence No. 17722 under the Aggregate Resources Act (ARA). In total 76.36 hectares are currently licenced as a pit. The annual tonnage condition is 1,000,000 tonnes.

The extraction of aggregate from a pit or quarry on private land designated by regulation, in the Province of Ontario, requires the issuance of a licence. Ontario Regulation 244/97 and the Aggregate Resources of Ontario Standards set out the application process and requirements.

For each new licence, the applicant must provide information (site plan, summary statement, technical reports) with respect to the existing features, operation and rehabilitation of the site to demonstrate that the proposed operation will minimize adverse impact on the environment.

For this proposal, the following information has been prepared and submitted to the Ministry of Natural Resources and Forestry (MNRF):

  • Site plan
  • Summary Statement
  • Natural Environment Report
  • Cultural Heritage Report
  • Maximum Predicted Water Table Report
  • Water Report (Level 1 and 2)
  • Noise Assessment Report (Acoustic Assessment Report)

The Site Plan addresses existing features of the pit and/or quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.

The Summary Statement includes information on one or more of the following considerations:  land use planning, agricultural classification, quality and quantity of aggregate, haul routes, truck traffic and entrance permits, progressive and final rehabilitation, surface water, and elevation of the established groundwater table.

The Natural Environment Report identifies the presence of significant natural heritage features/areas that exist on the site or within 120 meters of the site. Where any of the features or areas have been identified, the report must identify and evaluate any negative impacts on the features or areas and ecological functions, and identify any proposed preventative, mitigative or remedial measures. The report must also identify if the application site or any of the features are located within a natural heritage system that has been identified by a municipality in ecoregions 6E and 7E or by the province as part of a provincial plan.

The Cultural Heritage Report must be consistent with provincial requirements under the Ontario Heritage Act and the Provincial Policy Statement. Screening checklists evaluating the potential for archaeological resources, built heritage and cultural heritage landscapes, with supporting documentation, is required. Where screening indicates that assessments are requirement to be completed, the assessment reports and letters from the Ministry of Tourism, Culture and Sport must be obtained.

A report must be prepared that details how the maximum predicted water table is identified in metres above sea level, relative to the proposed depth of excavation at the site. Applications proposing to excavate below the maximum predicted water table must complete a Water Report. Level 1 determines the potential for impacts to ground water and surface water resources and their uses. If the Level 1 identifies a potential for impacts resulting from the operation, then an impact assessment (Level 2) is required to determine the significance of the effect and potential for mitigation.

A Noise Assessment report is prepared if proposed excavation and/or processing facilities are within 150 meters (for pit applications) or 500 meters (for quarry applications) of a sensitive receptor. The report is required to determine whether provincial guidelines for Stationary and Transportation Sources can be satisfied.

The Ministry reviews all comments received through the Environmental Registry and the notification and consultation process under the ARA and considers them before making a decision. Comments received through the Environmental Registry are considered by the Ministry however, the process under the ARA is proponent driven. This means that comments for consideration by the applicant under the ARA process must be submitted to the applicant and the Ministry during the 60-day consultation period initiated by the applicant.

Details of the application process can be found in Ontario Regulation 244/97 under the ARA and on the Ministry website at aggregate resources|ontario.ca. Many regulatory changes for new applications took effect on April 1, 2021. This means that applications submitted after March 31, 2021 must meet the new requirements in Ontario Regulation 244/97 and Aggregate Resources of Ontario Standards.

Public consultation opportunities

Written notice concerning this application was delivered to landowners within 120 meters of the proposed licensed boundary; an information sign, giving notice to the public of this application, was erected at the proposed site; and a public notice of application appeared in the local paper, the Renfrew Mercury on February 23, 2023.

The information submitted in support of this application can be viewed at https://tomlinsongroup.com/storyland-pit-technical-documents or by contacting nderuyter@mhbcplan.com.

A Public Information Session will be held on Tuesday April 4, 2023, from 5 to 7 p.m. at the Horton Community Centre (1005 Castleford Road, Renfrew) to provide information to the public and answer questions related to the application.

The application for this licence is being circulated within the MNRF. Additionally, notification of this application has been forwarded to the County of Renfrew, Township of Horton, Ministry of the Environment, Conservation and Parks, and Hydro One for comment.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNRF - ROD - DDB - Aggregates Section
Address

300 Water Street, 4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 13 mars 2023
au 13 mai 2023

Communiquer avec nous

Contact

Julie Magee

Phone number
Email address
Office
MNRF - ROD - DDB - Aggregates Section
Address

300 Water Street, 4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis