Gott Enterprises Inc. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-7178
Numéro de référence du ministère
5364-CSAKKQ
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 6 juin 2023 au 6 juillet 2023 (30 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice was updated on September 3rd, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 6 juin 2023
au 6 juillet 2023

Résumé de la proposition

This proposal is for an amendment to Permit to Take Water No. 0655-CC69N7T issued to Gott Enterprises Inc. to remove Well 3 and add Well 6.

Détails de l'emplacement

Adresse du site

425282 Sideroad 25
Shelburne, ON
Canada

Détails de l'emplacement du site

Lot 25, Concession 2

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Gott Enterprises Inc.
485387 30 Sideroad
Shelburne, ON
L9V 3N5
Canada

Détails de la proposition

This proposal is to amend Permit to Take Water No. 0655-CC69N7T issued to Gott Enterprises Inc. to remove Well 3 and add Well 6 for commercial water bottling. Details of the water taking are as follows:

Permit type: Amendment

Source name: Well #4

  • purpose: commercial water bottling
  • maximum rate per minute (litres): 227
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (Litres: 327,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 10 years

Source name: Well #5 and Well #6 (combined)

  • purpose: commercial water bottling
  • maximum rate per minute (litres): 227
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (Litres: 327,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 6 juin 2023
au 6 juillet 2023

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis