Cette consultation a eu lieu :
du 27 octobre 2023
au 11 décembre 2023
Résumé de la décision
We issued an Environmental Compliance Approval with Limited Operational Flexibility for all new or historically unapproved sources for all emissions from Lafarge Canada Inc., a cement grinding facility, located in Algoma Mills, Ontario.
Détails de l'emplacement
Adresse du site
3136A Highway 17
The North Shore Township,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Lafarge Canada Inc.
1651 Bearbrook Road
Ottawa,
ON
K1G 3K2
Canada
Détails de la décision
We issued Environmental Compliance Approval number 4411-D7BNCX, dated July 29, 2024, to Lafarge Canada Inc., for their cement grinding facility located at 3136A Highway 17 in the community of Algoma Mills, Ontario.
An Environmental Compliance Approval with Limited Operational Flexibility Mobile replaces all current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lafarge Canada Inc.
The Approval includes all sources at the facility, including a mill grinding system, consisting of a roller-press, ball mill and a high efficiency separator, served by one baghouse dust collector, one baghouse dust collector, serving the New Cement Silos, one baghouse dust collector, serving the South Portland Cement Silo, one baghouse dust collector, serving the North Portland Cement Silo, and a natural gas fired material handling, all operating with a Facility Production Limit of 337,260 tonnes of slag per year.
Emissions to the air from this facility include:
- particulate matter
- calcium oxide
- respirable crystalline silica
- nitrogen oxides and other products of combustion
The Environmental Compliance Approval with Limited Operational Flexibility when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 2 août 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Lafarge Canada Inc.
1651 Bearbrook Road
Ottawa,
ON
K1G 3K2
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility Mobile (air & noise) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lafarge Canada Inc., a cement grinding facility, located in Algoma Mills, Ontario.
The application includes all sources at the facility, including a mill grinding system, consisting of a roller-press, ball mill and a high efficiency separator, served by one baghouse dust collector, one baghouse dust collector, serving the New Cement Silos, one baghouse dust collector, serving the South Portland Cement Silo, one baghouse dust collector, serving the North Portland Cement Silo, and a natural gas fired material handeling, all operating with a Facility Production Limit of 337, 260 tonnes of slag per year.
Emissions to the air from this facility include:
- particulate matter
- calcium oxide
- respirable crystalline silica
- nitrogen oxides and other products of combustion
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 27 octobre 2023
au 11 décembre 2023
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0