Update Announcement
The proposal notice is being updated on April 03, 2024 to advise the public that the permit application is still under review and the Ministry is considering concerns raised by an Aboriginal community which warrant additional time to adequately consider. The original proposal date and comment period have not been altered. The anticipated date of decision is April 15, 2024.
Cette consultation a eu lieu :
du 19 janvier 2024
au 18 février 2024
Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-24-000012 to 2681891 Ontario Inc. (“the proponent”) for early exploration activities.
The decision is to issue the mineral exploration permit.
Détails de l'emplacement
Détails de l'emplacement du site
The early exploration activities are located approximately 34 kilometres west of Timmins, Ontario, in Whitesides Twp, District of Cochrane, Northeast Region.
Claim numbers instructions: To view individual claims on a map please use the Mining Lands Administration System(MLAS). Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.
Claim numbers: 832125
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
2681891 ONTARIO INC
174 Renee Place
Timmins,
ON
P4P 1E8
Canada
Détails de la décision
On April 16, 2024, the ministry issued the proposed early exploration permit
This permit will allow the company to conduct:
- mechanized drilling (where the drill weight is greater than 150 kilograms)
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Effets de la consultation
Comments received were considered in the decision, however, did not result in additional terms and conditions on the issued permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Amanda Rantala
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Proposition initiale
Détails de la proposition
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- mechanized drilling (where the drill weight is greater than 150 kilograms)
The potential disturbance from the activities are described as:
Mechanized Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 19 janvier 2024
au 18 février 2024
Communiquer avec nous
Contact
Amanda Rantala
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0