Otter Creek Sand and Gravel Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-8497
Numéro de référence du ministère
1000269305
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 11 avril 2024 au 26 mai 2024 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
26 mai 2024

Résumé de la proposition

The proposal is for a new Environmental Compliance Approval (ECA) for the discharge of water from a proposed aggregate wash plant for the existing gravel pit, located at 168 Bruce Road 3 in Mildmay, Ontario (License ALPS 4680). The existing gravel pit operation is located on Part Lots 20 and 21, Concession C in the Township of Carrick, Ontario.

Détails de l'emplacement

Adresse du site

168 Bruce Road 3, Mildmay
South Bruce , ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Otter Creek Sand and Gravel Inc.
541193 Concession 14 NDR
Chesley, ON
N0G 1L0
Canada

Détails de la proposition

The proposal is for a new Environmental Compliance Approval (ECA) for the discharge of water from a proposed aggregate wash plant for the existing gravel pit located at 168 Bruce Road 3 in Mildmay, Ontario (License ALPS 4680). The existing gravel pit operation is located on Part Lots 20 and 21, Concession C in the Township of Carrick, Municipality of South Bruce, Ontario.

The proposed wash plant will process sand and gravel materials to remove silt and clay-sized particles and produce sand and gravel products of various sizes. The discharge water from the wash plant will be directed to settling ponds within the limits of extraction, where the water will infiltrate to the groundwater system and the fines will retained in the pond for re-use on-site. The discharge from the proposed operation is not intended to manage storm water.

The following processes will be undertaken as part of the wash plant operations to occur at the Subject Property. Native mined aggregate will be fed into a hopper or a conveyor belt that will lead into the wash plant. The material will then be screened to separate out larger rocks and boulders that may be mixed with the sand and gravel. The water supply will be an excavated pond on-site which will supply the wash plant using a pump and hoses. Excavated infiltration ponds (i.e., settling ponds) will be used for the wash plant discharge and will be located above the water table.

The settling pond(s) will be sized appropriately, allowing fines to settle to the bottom and the clear water to infiltrate back into the gravel pit maintaining the same rate of for takings and returns. This method will prevent turbid water from entering natural surface water systems (primarily Otter Creek) and will ensure the sustainability of the onsite resources.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis