Compton Mining Corp. - Mineral exploration permit

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Mineral exploration permit

Numéro du REO
019-8549
Numéro de référence du ministère
PR-24-000056
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Mines
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 16 avril 2024 au 16 mai 2024 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 16 avril 2024
au 16 mai 2024

Résumé de la décision

The Director of Exploration has made a decision on the exploration permit application PR-24-000056 to Compton Mining Corp. for early exploration activities.

The decision is to issue the mineral exploration permit.

Détails de l'emplacement

Détails de l'emplacement du site

The early exploration activities are located approximately 64 kilometres south east of Red Lake, Ontario, in Belanger areas, District of Red Lake, Northern Region.

Lease numbers instructions: To view individual leases on a map please use the Mining Lands Administration System. Click on “Search by Location” and select “Mining Lease” to search by lease numbers or “Find a township” to search by township.

Lease numbers: 861510

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Compton Mining Corp.
777 Richards Street
Vancouver, BC
V6B 0M9
Canada

Détails de la décision

On May 23, 2024 the ministry issued the proposed early exploration permit

This permit will allow the company to conduct:

  • Pitting and Trenching of Bedrock (greater than 3 cubic metres in a 200-metre radius)
  • Mechanized Drilling (where the drill weight is greater than 150 kilograms)

Plan activities

  • Geophysical Survey Requiring Generator Type
  • Pitting and Trenching (great than 1 cubic metres, less than 3 cubic metres in a 200-metre radius)
  • Line Cutting (less than 1.5 metres in width)

The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received resulting in no impact on the decision to proceed or not with this proposal.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

How to Appeal

Les appels ne sont pas autorisés

Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-8549
Numéro de référence du ministère
PR-24-000056
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Mines
Proposition affichée

Période de consultation

16 avril 2024 - 16 mai 2024 (30 days)

Détails de la proposition

The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow the proponent to carry out are as follows:

  • Pitting and Trenching of Bedrock (greater than 3 cubic metres in a 200-metre radius)
  • Mechanized Drilling (where the drill weight is greater than 150 kilograms)
  • Plan activities

  • Geophysical Survey Requiring Generator Type
  • Pitting and Trenching (great than 1 cubic metres, less than 3 cubic metres in a 200-metre radius)
  • Line Cutting (less than 1.5 metres in width)

The potential disturbance from the activities are described as:

Pitting and trenching are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.

Mechanized drilling provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Line Cutting (less than 1.5 metres in width) the activity consists of line-cutting, using hand tools only. Potential environmental disturbances include clearing out the underbrush. In line cutting where there is ground cover present, potential environmental disturbances include clearing the brush and vegetation. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.

Geophysical Survey Requiring Generator Type the activity consists of line-cutting, using hand tools only. Potential disturbances include clearing out underbrush to establish a grid in order to temporarily lay wire lines used to record geophysical measurements. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.

Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 16 avril 2024
au 16 mai 2024

Communiquer avec nous

Contact