CGC Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
013-4512
Numéro de référence du ministère
8281-B7DKUJ
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 10 janvier 2019 au 24 février 2019 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 10 janvier 2019
au 24 février 2019

Résumé de la décision

An amendment to an Environmental Compliance Approval (Air & Noise) with Limited Operational Flexibility has been granted to CGC Inc., a manufacturer of gypsum wallboard located in Hagersville, Ontario.

Détails de l'emplacement

Adresse du site

55 3rd Line Road
Hagersville, ON
N0A 1H0
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

CGC Inc.
Post Office Box Delivery 99
Hagersville, ON
N0A 1H0
Canada

Détails de la décision

Decision on instrument

An amendment to an Environmental Compliance Approval (Air & Noise) with Limited Operational Flexibility has been granted to CGC Inc., a manufacturer of gypsum wallboard located in Hagersville, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include packing lines, board lines, milling operations, kettle burners, fugitive dust sources, maintenance activities and non-process sources of combustion. The amendment includes the replacement of the Line #3 Kiln burners.

Emissions to the air from this facility include:

  • sodium pyrithione
  • nitrogen oxides
  • lead
  • particulate matter

The Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

The attached document is intended for posting on the Environmental Registry in order to provide the reader with the substantive content of the issued instrument. Please note the official version may be differently formatted or otherwise contain minor variations from this version.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Environmental Approvals Access and Service Integration Branch
Address

135 St. Clair Avenue West
1st floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Hamilton District Office
Address

119 King Street West
Floor 9
Hamilton, ON
L8P 4Y7
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 22 mai 2019 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Jeffrey McKerrall
Manager

Environmental Assessment and Permissions Branch
135 St Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

416-314-8302

Proponent(s)

CGC Inc.
Post Office Box Delivery 99
Hagersville, ON
N0A 1H0
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
013-4512
Numéro de référence du ministère
8281-B7DKUJ

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
013-4512
Numéro de référence du ministère
8281-B7DKUJ
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

10 janvier 2019 - 24 février 2019 (45 days)

Détails de la proposition

Description of instrument

This proposal is for an amendment to Environmental Compliance Approval (Air & Noise) No. 4689-9ZCPDE with Limited Operational Flexibility for CGC Inc., a manufacturer of gypsum wallboard located in Hagersville, Ontario.

The emission sources from the manufacturing and associated processes that exhaust to the air include:

  • packing lines,
  • board lines,
  • milling operations,
  • kettle burners,
  • fugitive dust sources,
  • maintenance activities and
  • non-process sources of combustion.

The amendment includes the replacement of the Line #3 Kiln burners.

Emissions to the air from this facility include:

  • sodium pyrithione,
  • nitrogen oxides,
  • lead, and
  • particulate matter.

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Environmental Approvals Access and Service Integration Branch
Address

135 St. Clair Avenue West
1st floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Hamilton District Office
Address

119 King Street West
Floor 9
Hamilton, ON
L8P 4Y7
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 10 janvier 2019
au 24 février 2019

Communiquer avec nous

Contact