CRH Canada Group Inc. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-8591
Numéro de référence du ministère
6277-D4GSEZ
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 25 avril 2024 au 25 mai 2024 (30 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
25 mai 2024

Résumé de la proposition

This proposal is for a renewal to Permit to Take Water No. 3658-AP8Q94 for CRH Canada Group Inc.. Water will be taken from one pond for quarry dewatering, dust control and aggregate washing purposes at the Campbell Quarry, located in the City of Kawartha Lakes, Ontario.

Détails de l'emplacement

Adresse du site

Lot 1, 2, and 3, Concession 2, Carden
Kawartha Lakes, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

CRH Canada Group Inc.
2300 Steeles Avenue West
4th Floor
Concord, ON
L4K 5x6
Canada

Détails de la proposition

This proposal is for a renewal to Permit to Take Water No. 3658-AP8Q94 for CRH Canada Group Inc.. Water will be taken from one pond for quarry dewatering, dust control and aggregate washing purposes at the Campbell Quarry, located in the City of Kawartha Lakes, Ontario. Details of water taking are as follows:

Source Name: Quarry Sump

  • purpose of taking: dewatering
  • maximum rate per minute (litres): 3,480
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 5,011,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source Name: Quarry Sump via Settling Pond 1

  • purpose of taking: dust control
  • maximum rate per minute (litres): 4,000
  • maximum number of hours of taking per day: 2
  • maximum volume per day (litres): 480,000
  • maximum number of days of taking per year: 100
  • period of taking: March 1 to November 30 for 10 years

Source Name: Quarry Sump via Settling Pond 2

  • purpose of taking: aggregate washing
  • maximum rate per minute (litres): 4,400
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 3,168,000
  • maximum number of days of taking per year: 220
  • period of taking: February 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis