Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-24-000099 to Apollo Exploration Inc. for early exploration activities.
The decision is to issue the mineral exploration permit.
Détails de l'emplacement
Détails de l'emplacement du site
The early exploration activities are located approximately 1 kilometre North of Atikokan, Ontario, in Finlayson Lake Area, Sawbill Bay Area, District of Thunder Bay, Northwest Region.
Claim numbers instructions: To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.
Claim numbers: 587427, 587428, 587429, 587430, 587431, 587432, 587433, 587434, 587436, 587437, 587438, 587439, 587440, 587441, 587442, 587443, 587444, 587445, 587446, 587447, 587448, 587449, 587450, 587451, 587452, 587453, 587454, 587455, 587456, 587457, 587458, 587459, 587460, 587461, 587462, 587463, 587464, 587465, 587466, 587467, 587468, 587469, 587470, 587471, 587472, 587473, 587475
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Apollo Exploration Inc
150 King St West
Suite 2800
Toronto,
ON
M5H 1J9
Canada
Détails de la décision
On July 24, 2024, the ministry issued the proposed early exploration permit
This permit will allow the company to conduct:
- line cutting (greater than 1.5 metres in width)
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- pitting and trenching of bedrock (greater than 3 cubic metres in a 200-metre radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan activities
- geophysical survey requiring generator type
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Effets de la consultation
No comments were received resulting in no impact on the decision to proceed or not with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Doug Nikkila
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- line cutting (greater than 1.5 metres in width)
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- pitting and trenching of bedrock (greater than 3 cubic metres in a 200-metre radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan activities
- geophysical survey requiring generator type
The potential disturbance from the activities are described as:
Line cutting (greater than 1.5 metres in width) is done to prepare an area of mineral potential for further geological or geophysical activities. The potential environmental disturbance includes (but are not limited to): cutting trees and vegetation greater than 1.5 metre corridor with an axe, machete or chainsaw, clearing underbrush, and driving wood pickets into the ground.
Mechanized surface stripping uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Pitting and trenching are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.
Mechanized drilling provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Geophysical survey requiring generator type the activity consists of line-cutting, using hand tools only. Potential disturbances include clearing out underbrush to establish a grid in order to temporarily lay wire lines used to record geophysical measurements. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 6 juin 2024
au 6 juillet 2024
Communiquer avec nous
Contact
Doug Nikkila
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0