Cette consultation a eu lieu :
du 13 juin 2024
au 28 juillet 2024
Résumé de la proposition
The ministry has accepted a risk assessment prepared for the owner, City of Toronto, as part of their development plans for a property at 955 Lake Shore Boulevard West, Toronto, Ontario.
Détails de l'emplacement
Adresse du site
955 Lake Shore Blvd. West
Toronto,
ON
M6K 3B9
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
City of Toronto
Metro Hall
55 John Street
Toronto,
ON
M5V 3C6
Canada
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified in the risk assessment may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of parkland and community as defined by Ontario Regulation 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act (the "Act").
Based on the documents provided to the ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents. The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with section 168.5 of the Act.
The director is considering issuing a Certificate of Property Use (CPU) in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- building construction restrictions
- property use restrictions
- barriers to site soils
- inspection and maintenance program of barriers to site soils
- soil and groundwater management plan
- site specific heath and safety plan for workers
- air monitoring requirements
- reporting requirements
The proposed CPU No. 4278-D5RQAX including the Section 197 Order, is provided as a link under the supporting materials section of this notice.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Communiquer avec nous
Contact
Richard Saunders
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 13 juin 2024
au 28 juillet 2024