Cette consultation a eu lieu :
du 25 juin 2024
au 9 août 2024
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Sprucedale Agromart Limited, a facility producing blended dry and liquid fertilizers and chemical pesticide distribution, located at 291 Yonge Street South in Tara, Ontario.
Détails de l'emplacement
Adresse du site
291 Yonge Street South
Tara,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Sprucedale Agromart Limited
291 Yonge Street South
Tara,
ON
N0H 2N0
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Sprucedale Agromart Limited. The facility produces blended dry and liquid fertilizers and chemical pesticide distribution, located at 291 Yonge Street South in Tara, Ontario.
The application includes all sources at the facility, including the dry fertilizer receiving, indoor/outdoor blending and outgoing operations, liquid fertilize receiving, blending and outgoing operations, liquid chemical pesticide receiving and outgoing operations and storage tanks.
Emissions to the air from this facility include:
- ammonium dihydrogen phosphate
- potassium sulfate
- potassium magnesium sulfate
- castor oil, polymer with polymethylenepolyphenylene isocyanate
- calcium hexaborate pentahydrate
- urea
- potassium chloride
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 25 juin 2024
au 9 août 2024