The ministry has issued a new Environmental Compliance Approval for industrial sewage works to RAM Iron & Metal Inc. for the company's Welland Metal Recycling Yard, located at 111 Ridge Road, Welland, Ontario.
Détails de l'emplacement
Adresse du site
111 Ridge Road
Welland,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Ram Iron & Metal Inc.
60 Ashwarren Road
Toronto,
ON
M3J 1Z5
Canada
Détails de la décision
The ministry has issued a new Environmental Compliance Approval for industrial sewage works to RAM Iron & Metal Inc. for the company's Welland Metal Recycling Yard, located at 111 Ridge Road, Welland, Ontario.
The site stormwater management system is proposed to detain and treat stormwater from the site prior to discharge to the roadside ditch along Ridge Road, then the downstream receiver, Lyons Creek and ultimately to the Welland Canal.
The proposed site drainage strategy will include a treatment train design with conveyance via vegetated swales or storm sewers, a series of check/filter berms, two underground storage tanks and an oil/grit separator. The stormwater will be treated prior to being discharged off-Site.
The ministry has imposed an effluent monitoring program as well as conditions requiring the client to report any findings to the ministry along with a recommendation for an enhanced treatment option for metals, if required, should the site not meet the imposed effluent criteria.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
301 St Paul Street
Floor 9, Suite 15
St Catharines,
ON
L2R 7R4
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 3 juillet 2025 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Ram Iron & Metal Inc.
60 Ashwarren Road
Toronto,
ON
M3J 1Z5
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
The application is for a new Environmental Compliance Approval for RAM Iron & Metal Inc., for industrial sewage works serving the Welland Metal Recycling Yard, located at 111 Ridge Road in Welland, Ontario.
The Site stormwater management system is proposed to detain and treat stormwater from the Site prior to discharge to the roadside ditch along Ridge Road, then the downstream receiver, Lyons Creek and ultimately to the Welland Canal. The proposed Site drainage strategy will include a treatment train design with conveyance via vegetated swales or storm sewers, a series of check/filter berms, two (2) underground storage tanks and an oil/grit separator. The stormwater will be treated prior to being discharged off-Site.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 31 juillet 2024
au 14 septembre 2024
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0