Cette consultation a eu lieu :
du 20 août 2024
au 19 septembre 2024
Résumé de la proposition
This proposal is for a new Permit to Take Water for Uniform Urban Developments Ltd. Water will be taken from four ponds for construction dewatering purposes in Carleton Place, County of Lanark, Ontario.
Détails de l'emplacement
Adresse du site
Lot 14 and 15, Concession 10, Beckwith
Carleton Place,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Uniform Urban Developments Ltd
117 Centrepointe Drive
Unit 300
Ottawa,
ON
K2G 5X3
Canada
Détails de la proposition
This proposal is for a new Permit to Take Water for Uniform Urban Developments Ltd. Water will be taken from four ponds for construction dewatering purposes in Carleton Place, County of Lanark, Ontario. Details of water taking are as follows:
Source Name: S1 - Building Excavations
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 8,400
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 2,000,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
Source of water: S2 - Servicing Excavations
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 8,400
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 3,500,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
Source of water: S3 - Stormwater Management Pond
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 8,400
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 3,000,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
Source of water: S4 - Miscellaneous
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 8,400
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 7,000,000
- maximum number of days of taking per year: 90
- period of taking: January 1 to December 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 août 2024
au 19 septembre 2024