Cette consultation a eu lieu :
du 26 août 2024
au 10 octobre 2024
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for 7974906 Canada Inc., operating as Alumicast Technologies, a manufacturer of various products and parts through die casting of aluminum and zinc alloys, located at 705 Bayview Drive in the City of Barrie, Ontario.
Détails de l'emplacement
Adresse du site
705 Bayview Drive
Barrie,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
7974906 Canada Inc., operating as Alumicast Technologies
705 Bayview Drive
Barrie,
ON
L4N 9A5
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from 7974906 Canada Inc., operating as Alumicast Technologies, a manufacturer of various products and parts through die casting of aluminum and zinc alloys, located at 705 Bayview Drive in the City of Barrie, Ontario.
This application is to reflect changes to operations and equipment including:
- the addition of Limited Operational Flexibility
- the increase of zinc and aluminum processing rates
- the addition of four (4) stacks for natural gas combustion, one (1) sidewall exhaust for natural gas combustion, and two (2) general side wall exhaust fans.
Emissions to the air from this facility include:
- nitrogen oxides
- lead
- nickel
- hexahydro-1,3,5-tri (2-hydroxyethyl)-s-triazine
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 26 août 2024
au 10 octobre 2024