Cette consultation a eu lieu :
du 9 septembre 2024
au 24 octobre 2024
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Hanon Systems EFP Canada Ltd., a manufacturer of e-compressor parts for the automotive industry, located in the City of Vaughan, Ontario.
Détails de l'emplacement
Adresse du site
470 Anatolian Drive
Vaughan,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Hanon Systems EFP Canada Ltd.
800 Tesma Way
Concord,
ON
L4K 5C2
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Hanon Systems EFP Canada Ltd., a manufacturer of e-compressor parts for the automotive industry, located in the City of Vaughan, Ontario.
The application includes all sources at the facility, including manufacturing and assembly line operations such as machining, washing, plating/coating, anodizing, assembling, and testing of e-compressor parts.
Emissions to the air from this facility include nitric acid and hydrofluoric acid.
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 septembre 2024
au 24 octobre 2024