Résumé de la décision
The director issued a director's direction to establish effluent limits, objectives, and monitoring plans for the former Lockerby Mine located on the Lockerby Mine Access Road in the Whitefish area of the Municipality of Greater Sudbury.
Détails de l'emplacement
Adresse du site
Lockerby Mine Access Road
City of Greater Sudbury,
ON
Canada
Détails de l'emplacement du site
Lot 2 Concession 5 of Denison Township
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
His Majesty the King in right of Ontario as represented by the Minister of Mines
933 Ramsey Lake Road
Sudbury,
ON
P3E 6B5
Canada
Détails de la décision
In 2015, the former Lockerby Mine reverted to the crown after the property owner First Nickel Mine Inc. went into receivership. The Ministry of Mines (MINES) has been progressively implementing closure measures at the property with the goal to achieve zero discharge from the site at final closure.
Since 2015, MINES has managed stormwater at the site by pumping from storage ponds into the underground workings to prevent any discharge to the environment, however available storage in the underground workings is decreasing as the mineshaft also naturally floods.
In 2023, MINES began to rebuild the site effluent treatment due to an increase in the rate of mineshaft flooding. The effluent treatment system is now in place.
MINES is required to apply for a new Environmental Compliance Approval for the discharge that meets current requirements. The old approval dates from 2002 and has no limits or monitoring requirements as the site was subject to the former Municipal/Industrial Strategy for Abatement/ Effluent Monitoring and Effluent Limits (MISA/EMEL) Regulations that have since been revoked.
This Director's Direction was issued to establish effluent limits, objectives, and monitoring and reporting plans for the former Lockerby Mine in case stormwater discharge to the environment is required before an amended Environmental Compliance Approval can be issued.
Effets de la consultation
No comments were received.
Compared to the draft director's direction posted in the ERO proposal, a figure was added to the appendix and cyanide was removed from monitoring requirements since it is not detected in water at the site.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 2 décembre 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
His Majesty the King in right of Ontario as represented by the Minister of Mines
933 Ramsey Lake Road
Sudbury,
ON
P3E 6B5
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Peter Wideman
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Proposition initiale
Détails de la proposition
In 2015, the former Lockerby Mine reverted to the crown after the property owner First Nickel Mine Inc. went into receivership. The Ministry of Mines (MINES) has been progressively implementing closure measures at the property with the goal to achieve zero discharge from the site at final closure.
Since 2015, MINES has managed stormwater at the site by pumping from storage ponds into the underground workings to prevent any discharge to the environment, however available storage in the underground workings is decreasing as the mineshaft also naturally floods.
In 2023, MINES began to rebuild the site effluent treatment due to an increase in the rate of mineshaft flooding. The effluent treatment system is now in place.
MINES is required to apply for a new Environmental Compliance Approval for the discharge that meets current requirements. The old approval dates from 2002 and has no limits or monitoring requirements as the site was subject to the former Municipal/Industrial Strategy for Abatement/ Effluent Monitoring and Effluent Limits (MISA/EMEL) Regulations that have since been revoked.
This proposal is for a new director’s direction to establish effluent limits, objectives, and monitoring and reporting plans for the former Lockerby Mine in case stormwater discharge to the environment is required before an amended Environmental Compliance Approval can be issued.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 27 septembre 2024
au 11 novembre 2024
Communiquer avec nous
Contact
Peter Wideman
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0