Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-24-000209 to 5042078 Ontario Inc. for early exploration activities.
The decision is to issue the mineral exploration permit.
Détails de l'emplacement
Détails de l'emplacement du site
The mining claims are located approximately 52 kilometres, north east of Thunder Bay, Ontario, in Hicks Lake Area District of Thunder Bay, North West Region.
Claim numbers instructions: To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.
Claim numbers: 592262, 592263, 592264, 592265, 592266, 592267, 592268, 592269, 592270, 592271, 592272, 592273, 592274, 592275, 592276, 592277, 592278, 592279, 592280, 592281
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
5042078 Ontario inc.
194 Raynard RD
Thunder Bay ,
ON
P7G 1K7
Canada
Détails de la décision
On December 23, 2024, the ministry issued the proposed early exploration permit.
This permit will allow the company to conduct:
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan activities
- geophysical survey requiring generator type
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Effets de la consultation
No comments were received resulting in no impact on the decision to proceed or not with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Tyler Manning
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan activities
- geophysical survey requiring generator type
The potential disturbance from the activities are described as: Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Mechanized Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Geophysical Survey Requiring Generator Type: the activity consists of line-cutting, using hand tools only. Potential disturbances include clearing out underbrush to establish a grid in order to temporarily lay wire lines used to record geophysical measurements. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 13 novembre 2024
au 13 décembre 2024
Communiquer avec nous
Contact
Tyler Manning
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0