Cette consultation a eu lieu :
du 21 novembre 2024
au 21 décembre 2024
Résumé de la proposition
This proposal is for an amendment and renewal to Permit to Take Water No. 4020-D3BJ7E for Agnico Eagle Mines Limited. Water will be taken from one well and two ponds for dewatering purposes at the Detour Mine, located in the Town of Cochrane, Ontario.
Détails de l'emplacement
Adresse du site
Cochrane,
ON
Canada
Détails de l'emplacement du site
Detour Lake Mine
185 kilometres northeast via Highway 652 from Cochrane
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Agnico Eagle Mines Limited
145 King Street East, Suite 400
Toronto,
ON
M5C 2Y7
Canada
Détails de la proposition
This proposal is for an amendment and renewal to Permit to Take Water No. 4020-D3BJ7E for Agnico Eagle Mines Limited. Water will be taken from one well and two ponds for dewatering purposes at the Detour Mine, located in the Town of Cochrane, Ontario. This amendment is to increase the water taking at the site. Details of the water taking are as follows:
Permit type – amendment and renewal
Source Name: Main Open Pit
- purpose: mining dewatering
- maximum rate per minute (litres): 110,846
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 159,619,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: North Pit
- purpose: mining dewatering
- maximum rate per minute (litres): 4,628
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 6,665,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Well Field
- purpose: mining dewatering
- maximum rate per minute (litres): 1,315
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,894,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 21 novembre 2024
au 21 décembre 2024