Cette consultation se termine à 23 h 59 le :
23 janvier 2025
Résumé de la proposition
The Ministry is proposing to issue a permit to First Class Metals Canada Inc. (“the proponent”) to undertake early exploration activities.
Détails de l'emplacement
Détails de l'emplacement du site
The early exploration activities are located approximately 25 kilometres southeast of Manitouwadge, Ontario, in Olga Lake Area, District of Thunder Bay, Northwest Region.
Claim numbers instructions: "To view individual claims on a map please use the Mining Lands Administration System. Click on "I want to…" and select "Find a claim" to search by claim numbers or "Find a township" to search by township.”
Claim numbers: 624162, 624163, 624164, 624165, 624166, 624167, 624168, 624169, 624170, 624171, 624172, 631648, 631649, 631650, 631651, 631652, 631653, 631654, 631655, 631656, 631657, 631658, 631659, 631660, 631661, 631662, 631663, 631664, 631665, 631666, 631667, 631668, 631669
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
First Class Metals Canada Inc.
55 York Street
Suite 401
Toronto,
ON
M5J 1R7
Canada
Détails de la proposition
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
- pitting and trenching of bedrock (greater than 3 cubic metres in a 200-metre radius)
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan activities
- line cutting (less than 1.5 metres in width)
- geophysical survey requiring generator type
The potential disturbance from the activities are described as:
Mechanized Surface Stripping uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Pitting and Trenching are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.
Mechanized Drilling provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Line Cutting (less than 1.5 metres in width) the activity consists of line-cutting, using hand tools only. Potential environmental disturbances include clearing out the underbrush. In line cutting where there is ground cover present, potential environmental disturbances include clearing the brush and vegetation. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.
Geophysical Survey Requiring Generator Type the activity consists of line-cutting, using hand tools only. Potential disturbances include clearing out underbrush to establish a grid in order to temporarily lay wire lines used to record geophysical measurements. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Communiquer avec nous
Contact
Colin Hovi
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Colin Hovi
435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada