Innocon Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
025-0223
Numéro de référence du ministère
6680-DDRRVU
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 13 mars 2025 au 27 avril 2025 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 13 mars 2025
au 27 avril 2025

Résumé de la décision

An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Innocon Inc., for the operating site located at 235 Wicksteed Avenue, Toronto, Ontario.

The facility production limit is 2,400 cubic metres of ready-mix concrete per day.

Détails de l'emplacement

Adresse du site

235 Wicksteed Avenue
Toronto, ON
Canada

Détails de l'emplacement du site

East York

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Innocon Inc.
50 Newkirk Road
Richmond Hill, ON
L4C 3G3
Canada

Détails de la décision

An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Innocon Inc., for the operating site located at 235 Wicksteed Avenue, Toronto, Ontario.

The facility production limit is 2,400 cubic metres of ready-mix concrete per day.

The application includes all sources at the facility, including:

  • aggregate material delivery, storage, and handling
  • cementitious materials delivery, storage, and handling
  • ready-mix concrete batching, truck loading, and shipping
  • maintenance facility including maintenance welding activities
  • natural gas-fired water heating system

Emissions to the air from this facility include:

  • nitrogen oxides
  • crystalline silica
  • slag
  • portland cement
  • particulate matter
  • silica fume

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise) requires that the company demonstrate compliance on an ongoing basis with Ontario Regulation 419/05, applicable Ministry Guidelines for Air and Noise and other performance requirements as specified in their conditions. It permits modifications such as process changes, de-bottlenecking or addition of new equipment subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise).

The Limited Operational Flexibility conditions will expire 10 years from the date of the Approval, unless this Approval is revoked prior to the expiry date. The company will be required to make application for amendment at that time to renew these conditions. Of specific public interest, one condition that is included with the Environmental Compliance Approval with Limited Operational Flexibility (air & noise) requires the company to make available, at all times, at the facility for inspection by interested members of the Public, a table (emission summary table) that documents the facility’s compliance with Ontario Regulation 419/05.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 14 août 2025 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)


Proponent(s)

Innocon Inc.
50 Newkirk Road
Richmond Hill, ON
L4C 3G3
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
025-0223
Numéro de référence du ministère
6680-DDRRVU

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
025-0223
Numéro de référence du ministère
6680-DDRRVU
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

13 mars 2025 - 27 avril 2025 (45 days)

Détails de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Innocon Inc., a ready-mix concrete plant and manufacturing facility, located in the City of Toronto, Ontario.

The application includes all sources at the facility, including:

  • ready-mix concrete batching
  • aggregate and cementitious material storage and handling
  • chemical storage
  • truck loading
  • shipping/delivery
  • maintenance activities

Emissions to the air from this facility include:

  • nitrogen oxides
  • crystalline silica
  • slag
  • portland cement
  • particulate matter
  • silica fume

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 13 mars 2025
au 27 avril 2025

Communiquer avec nous

Contact