Cette consultation a eu lieu :
du 14 mars 2025
au 13 avril 2025
Résumé de la proposition
This proposal is for an amendment to Permit to Take Water (PTTW) No. P300-6293066621 for Abacus Equity Infusion Limited. Water will be taken from four ponds for construction dewatering purposes, located in the Town of Whitby, Ontario.
Détails de l'emplacement
Adresse du site
Lot 21 and 22, Concession 7
Whitby,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Abacus Equity Infusion Limited
3700 Steeles Avenue West, Suite 800
Vaughan,
ON
L4L 8K8
Canada
Détails de la proposition
This proposal is for an amendment to Permit to Take Water (PTTW) No. P300-6293066621 for Abacus Equity Infusion Limited. Water will be taken from four ponds for construction dewatering purposes, located in the Town of Whitby, Ontario.
Permit type – amendment
Source Name: Phase 1 SWM Pond
- purpose: construction dewatering
- source of water: pond (isolated)
- maximum rate per minute (litres): 1,413
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 2,035,300
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: two years
Source Name: Phase 1 Trench Excavations
- purpose: construction dewatering
- source of water: pond (isolated)
- maximum rate per minute (litres): 642
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 924,300
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: two years
Source Name: Phase 2 SWM Pond
- purpose: construction dewatering
- source of water: pond (isolated)
- maximum rate per minute (litres): 309
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 444,700
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: two years
Source Name: Phase 2 Trench Excavations
- purpose: construction dewatering
- source of water: pond (isolated)
- maximum rate per minute (litres): 419
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 602,700
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: two years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 14 mars 2025
au 13 avril 2025