Cette consultation se termine à 23 h 59 le :
16 avril 2025
Résumé de la proposition
This proposal is for the renewal of Permit to Take Water (PTTW) No. 8221-CWPNDX to take water for dewatering and remediation purposes for Earlglen Investments Inc.. Water will be taken from six wells related to construction activities, located in the City of Richmond Hill, Ontario.
Détails de l'emplacement
Adresse du site
921 19th Avenue
Richmond Hill,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Earlglen Investments Inc.
3550 Langstaff Road
Vaughan,
ON
L4L 9G3
Canada
Détails de la proposition
This proposal is for the renewal of Permit to Take Water (PTTW) No. 8221-CWPNDX to take water for dewatering and remediation purposes for Earlglen Investments Inc.. Water will be taken from six wells related to construction activities, located in the City of Richmond Hill, Ontario. Details of water taking are as follows:
Permit Type - Renewal (Category 1)
Source One
- purpose of water taking: construction - dewatering
- source of water: well - driven / jetted
- maximum rate (litres per minute): 984.53
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day: 1,417,722.05
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
Source Two
- purpose of water taking: construction - dewatering
- source of water: Well - Driven / Jetted
- maximum rate (litres per minute): 381.26
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day: 549,015.48
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
Source Three
- purpose of water taking: construction - dewatering
- source of water: Well - Driven / Jetted
- maximum rate (litres per minute): 852.91
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day: 1,228,192.48
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
Source Four
- purpose of water taking: construction - dewatering
- source of water: Well - Driven / Jetted
- maximum rate (litres per minute): 980.14
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day:: 1,411,406.93
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
Source Five
- purpose of water taking: construction - dewatering
- source of water: Well - Driven / Jetted
- maximum rate (litres per minute): 1,444.2
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day: 2,079,642.29
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
Source Six
- purpose of water taking: construction - dewatering
- source of water: Well - Driven / Jetted
- maximum rate (litres per minute): 1,820.47
- maximum number of hours of taking per day: 24.00
- maximum volume (litres) per day: 2,621,478.48
- maximum number of days of taking in a year: 365.00
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: two years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada