ALAMOS GOLD INC - Approval for variance from the Liquid Fuels Handling Code

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Approval for variance from the Liquid Fuels Handling Code

Numéro du REO
025-0260
Numéro de référence du ministère
WO 14576859
Type d'avis
Instrument
Loi
Technical Standards & Safety Act, 2000
Affiché par
Technical Standards and Safety Authority (TSSA)
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 12 mars 2025 au 11 avril 2025 (30 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
11 avril 2025

Résumé de la proposition

ALAMOS GOLD INC requested a temporary variance until December 31, 2025 for operating a bulk plant without an oil/water separator.

Détails de l'emplacement

Adresse du site

15 GOUDREAU RD
DUBREUILVILLE, ON
P0S 1B0
Canada

Détails de l'emplacement du site

Bulk plant at mining site

Promoteur(s)

ALAMOS GOLD INC
161 AV PRINCIPALE
ROUYN-NORANDA, QC
J9X 4P6
Canada

Détails de la proposition

Liquid Fuels Handling Code (LFHC) Requirements that Would Not be Met:

5.6.1.10.

All bulk plants shall be designed with an oil/water separator, acceptable to the

Ministry of the Environment and Climate Change.

 

Safety Assessment

Several features and risk mitigation measures exist to ensure that the refuelling of the mobile

tankers can be performed safely without an oil-water separator. These features are outlined below:

 

1. During fueling the operator remains within approximately 2 meters of the fuel connection and

emergency stop device. This allows for an immediate operator response in the event of a concern. Even in the unlikely event of a component failure, operator response will be very rapid to avoid a significant spill.

 

2. The refuelling connection is a double dry-break connection so that upon disconnect, the

contents from the truck and the fueling couplings are contained. It is a standard operating

requirement that the operator places a containment pan under the fuel connection during the

connection, fueling process, and disconnection of the truck. Any minor drips or spills during the

connection process will be captured.

 

3. Fuel tanker overfill prevention will be ensured using a Scully Intellitrol system which is

interlocked to ensure that the vehicle cannot be inadvertently overfilled. This equipment is the

same as and meets the safety standards of fuel transfer equipment at major distribution terminals.

 

4. The fuel facility is equipped with numerous global emergency stop devices (situated at all

fueling locations) to immediately stop the flow of ALL fuel in the event of a leak or spill. During

the tanker refueling process, the operator procedure requires that the driver remain in attendance

at the fuel connection point which is within approximately 2 meters of an emergency stop device.

This proximity will help ensure that the equipment can be shut down to prevent any significant spill during the tanker refuelling process.

 

5. The fuel facility is equipped with a large readily accessible spill containment kit in the

event of a leak or spill. This kit includes spill booms, spill mats, absorbent materials, collection

drums, and spill/drip trays. These materials are stored on site.

 

6. The bulk fuel tanker will be positioned inside a spill containment “lane” when it is

being loaded. A fuel-resistant liner will be buried below the truck loading area and covered

with a granular cap. The ends of the lane will be closed off with spill containment

socks/booms to provide containment.

TSSA assesses that there is likely to be no environmental impact should this variance be granted.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Technical Standards and Safety Authority
Address

345 Carlingview Drive
Toronto, ON
M9W 6N9
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Marek Kulik

Phone number
Email address
Office
Technical Standards and Safety Authority
Address

345 Carlingview Drive
Toronto, ON
M9W 6N9
Canada

Office phone number

Communiquer avec nous

Contact

Marek Kulik

Phone number
Email address
Office
Technical Standards and Safety Authority
Address

345 Carlingview Drive
Toronto, ON
M9W 6N9
Canada

Office phone number

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis