The Cadillac Fairview Corporation Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
025-0343
Numéro de référence du ministère
0157-DEUG8K
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 1 avril 2025 au 1 mai 2025 (30 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
1 mai 2025

Résumé de la proposition

This proposal is for a new Permit to Take Water for the purpose of construction/dewatering for The Cadillac Fairview Corporation Limited.

Détails de l'emplacement

Adresse du site

Lake Shore Boulevard East
Toronto, ON
Canada

Détails de l'emplacement du site

Saulter Street South,

Logan Avenue,

Commissioners Street, and

515 Commissioners Street

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

The Cadillac Fairview Corporation Limited
20 Queen Street West
Toronto, ON
M5H 3R4
Canada

Détails de la proposition

This proposal is for a new Permit to Take Water for the purpose of construction/dewatering for The Cadillac Fairview Corporation Limited. Water will be taken from 15 sources located in the City of Toronto. Details of the water taking are as follows:

Permit type: New

Source Name: Lake Shore (Sanitary Sewer)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 817
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 1,177,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Saulter (Sanitary Sewer)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 1,200
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 1,728,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Lake Shore (Storm Sewer)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 904
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 1,302,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Lake Shore (Sanitary Forcemain)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 787
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 1,133,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Launch Shaft MH4

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 18
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 26,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Exit Shaft MH3

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 24
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 35,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Launch Shaft MH2

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 47
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 67,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Exit Shaft MH1

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 27
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 39,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Turning Basin Easement

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 369
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 531,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Carlaw Culvert

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 334
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 481,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Sanitary Sewer Relocation at MH2

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 430
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 619,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Sanitary Pump Station and Valve Chamber

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 32
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 46,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Logan North (Sanitary Forcemain)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 462
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 665,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Logan North (Storm Sewer - South of Eastern)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): 38
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 55,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

Source Name: Logan North (Storm Sewer - North of Eastern)

  • purpose: construction/dewatering
  • maximum rate per minute (litres): eight
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 12,000
  • maximum number of days of taking in a year: 365
  • period of taking: January 1 to December 31 for 53 months

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis