Cette consultation a eu lieu :
du 23 avril 2025
au 23 mai 2025
Résumé de la proposition
This proposal is for renewal of expired Permit To Take Water No. 3304-CKBVRM for the purpose of golf course irrigation for DBS - Hearn Inc.
Détails de l'emplacement
Adresse du site
2135 County Road 12
Essex,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
DBS - Hearn Inc.
Post Office Box 142
Amherstburg,
ON
N9V 2Z3
Canada
Détails de la proposition
This proposal is for renewal of expired Permit To Take Water No. 3304-CKBVRM for the purpose of golf course irrigation for DBS - Hearn Inc. Details of the water taking are as follows:
Permit type: renewal
Source Name: Well 1
- purpose: golf course irrigation
- maximum rate per minute (litres): 201
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 289,440
- maximum number of days of taking in a year: 230
- period of taking: March 15 to November 30 for 10 years
Source Name: Pond 3+2
- purpose: golf course irrigation
- maximum rate per minute (litres): 2,840
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 4,089,600
- maximum number of days of taking in a year: 261
- period of taking: March 15 to November 30 for 10 years
Source Name: Pond 1
- purpose: golf course irrigation
- maximum rate per minute (litres): 1,500
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 2,160,000
- maximum number of days of taking in a year: 60
- period of taking: March 15 to November 30 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 23 avril 2025
au 23 mai 2025