Cette consultation a eu lieu :
du 9 mai 2025
au 23 juin 2025
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of stormwater management facilities owned by 685109 Ontario Limited, in support of a proposed Plaza Development; for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 17557 Woodbine Avenue, in East Gwillimbury.
Détails de l'emplacement
Adresse du site
17557 Woodbine Avenue
Town of East Gwillimbury,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
685109 Ontario Limited
2 Bales Drive West
East Gwillimbury,
ON
L0G 1V0
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of stormwater management facilities owned by 685109 Ontario Limited, in support of a proposed Plaza Development; for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 17557 Woodbine Avenue, in the Town of East Gwillimbury, Regional Municipality of York, Ontario.
The sewage works system will consist of a permanent stormwater management (wet pond) and associated stormwater outfall to the existing drainage feature to the east of the property, designed for quantity control; discharging via drainage feature, within the Black River watershed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 mai 2025
au 23 juin 2025