Cette consultation a eu lieu :
du 22 mai 2025
au 6 juillet 2025
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for the proposed use of a sewage system that services the property known as Loon's Landing, located at 263 A Hass Road, in Alban, Ontario. The proposed sewage works include the use of four septic tanks.
Détails de l'emplacement
Adresse du site
263-A Hass Road
Municipality of French River,
ON
P0M 1A0
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Darrell Keith Boyd
263 Hass Road, Suite A
Alban,
ON
P0M 1A0
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for the proposed use of a sewage system that services the property known as Loon's Landing, located at 263 A Hass Road, in Alban, Ontario.
The proposed sewage works include the use of: two 8,250 litre septic tanks, one 3,636 litre septic tank, and one 5,455 litre septic tank.
The septic tanks are proposed to dose four subsurface disposal fields, with a total pipe length of 279 meters of sewer pipe. One existing greywater subsurface disposal field is proposed to be used associated with the shower building on Site. Additionally, one 11,365 litre sewage holding tank, one 13,638 litre sewage holding tank, and one 5,682 litre sewage holding tank are present on Site. The holding tanks are pumped out by a licensed septic hauler.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 22 mai 2025
au 6 juillet 2025