Cette consultation a eu lieu :
du 27 juin 2025
au 11 août 2025
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 4964- 7AYPUS for Bernt Gilbertson Enterprises Limited to include noise operational flexibility within the Northern Region district boundary of the Ministry of the Environment, Conservation and Parks for a one-year period.
Détails de l'emplacement
Adresse du site
Mobile Facility
St. Joseph ,
ON
Canada
Promoteur(s)
Bernt Gilbertson Enterprises Limited
3107 Huron Line
St. Joseph ,
ON
P0R 1J0
Canada
Détails de la proposition
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 4964- 7AYPUS for Bernt Gilbertson Enterprises Limited to include noise operational flexibility conditions related to the operation of portable equipment used for the crushing and screening of aggregate within the Northern Region district boundary of the& Ministry of the Environment, Conservation and Parks for a one-year period.
The proposed operational flexibility conditions, if granted, will provide modified noise setback distances to allow the company to operate the portable equipment in more locations where specific operating requirements are met, such& as:
- where a nearby receptor (e.g., dwelling) is unoccupied for the duration of the activity
- the nearby receptor (e.g., dwelling) is entirely shielded from the portable equipment
- where site-specific measurements and/or modelling demonstrate that Ministry noise limits will still be met despite decreased setback distances
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 27 juin 2025
au 11 août 2025