Cette consultation a eu lieu :
du 22 juillet 2025
au 21 août 2025
Résumé de la proposition
This proposal is for a renewal Permit to Take Water No. 6028-A2LKAW for dam/reservoir purposes. Water will be taken from Little Cedar Lake in Bomby, Ontario.
Détails de l'emplacement
Adresse du site
Highway 17 4.5 km West of Junction of Highway 614 & Highway 17, 40 km East of Marathon
Bomby,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Williams Operating Corporation
Highway 17, P.O. Bag 500
Bomby,
ON
P0T 2E0
Canada
Détails de la proposition
This proposal is for a renewal Permit to Take Water No. 6028-A2LKAW for dam/reservoir purposes. Water will be taken from Little Cedar Lake in Bomby, Ontario. Details of the water taking are as follows:
Permit type – renewal
Source of water: Little Cedar Lake
- purpose of taking: dams/reservoirs
- maximum rate per minute (litres): 2,916,667
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 4,200,000,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 22 juillet 2025
au 21 août 2025