Suncor Energy Inc. operating as Suncor Energy Products Partnership - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
025-0989
Numéro de référence du ministère
4388-DKXLZQ
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 4 septembre 2025 au 4 octobre 2025 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 4 septembre 2025
au 4 octobre 2025

Résumé de la proposition

This proposal is for a renewal of Permit to Take Water No. 8233-AKULE6 for construction and operation of a groundwater depression/extraction system which is a part of a remediation action plan for a reduction of benzene in soil and groundwater.

Détails de l'emplacement

Adresse du site

Sarnia, ON
Canada

Détails de l'emplacement du site

PART LOT C PL 122 SARNIA CITY AS IN SA79580 (SECONDLY); PART LOT 4 RANGE 7 PL 122 SARNIA CITY AS IN L151174 W OF RAILWAY LANDS AS SHOWN ONTARIO PP612; S/T L130569, L291082; SARNIA

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Suncor Energy Inc. operating as Suncor Energy Products Partnership
1900 River Road
Sarnia, ON
N7T 7J3
Canada

Détails de la proposition

This proposal is for a renewal of Permit to Take Water No. 8233-AKULE6 for construction and operation of a groundwater depression/extraction system which is a part of a remediation action plan for a reduction of benzene in soil and groundwater. Details of the water taking are as follows:

Permit type – renewal

Source of water: Multiple Well Points

  • purpose of taking: remediation
  • maximum rate per minute (litres): 208
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 500,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): January 1st
  • latest calendar date of taking (mm/dd): December 31st
  • length of time: 10 years

There are three categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 4 septembre 2025
au 4 octobre 2025

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis