C. VILLENEUVE CONSTRUCTION CO. LTD. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
025-0996
Numéro de référence du ministère
1000374062
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 8 septembre 2025 au 8 octobre 2025 (30 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
8 octobre 2025

Résumé de la proposition

This proposal is for a new Permit to Take Water for Driftwood Quarry, west of Cochrane for C. VILLENEUVE CONSTRUCTION CO. LTD. Water will be taken from Driftwood quarry for dewatering purposes to maintain dry conditions.

Détails de l'emplacement

Adresse du site

Lot 9 Concession 5 Geographic Township of Calder
District of Cochrane, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

C. VILLENEUVE CONSTRUCTION CO. LTD.
1533 HIGHWAY 11
HEARST, ON
P0L 1N0
Canada

Détails de la proposition

This proposal is for a Permit to Take Water for Driftwood Quarry, west of Cochrane. Water will be taken from Driftwood quarry for dewatering purposes to maintain dry conditions. Details of the water taking are as follows:

Permit type – new

Source name: Driftwood Quarry

  • purpose: initial quarry dewatering
  • maximum rate per minute (litres): 18,750
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 27,000,000
  • maximum number of days of taking per year: 60
  • earliest calendar date of taking (mm/dd): January 1st
  • latest calendar date of taking (mm/dd): December 31st
  • period of taking: 10 years

Purpose: Maintenance Quarry Dewatering

  • maximum rate per minute (litres): 1,994
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 2872000
  • maximum number of days of taking per year: 305
  • earliest calendar date of taking (mm/dd): January 1st
  • latest calendar date of taking (mm/dd): December 31st
  • period of taking: 10 years

There are three categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis