Résumé de la décision
Issuance of an Environmental Compliance Approval (ECA) for the establishment of sewage works for the collection, conveyance, treatment, and disposal of stormwater, as well as spill containment works, servicing the proposed Vaughan 3 Energy Storage 1 GP Inc. Battery Energy Storage System (BESS) facility.
Détails de l'emplacement
Adresse du site
6531 Rutherford Road
Vaughan,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Vaughan 3 Energy Storage 1 GP Inc. as general partner for and on behalf of Vaughan 3 Energy Storage 1 LP
161 Cityview Boulevard
Vaughan,
ON
L4H 0A9
Canada
Détails de la décision
expansion of sewage works for the collection, transmission and disposal of stormwater as well as spill containment works servicing a newly proposed battery energy storage system (BESS) facility and the existing transformer station located at 6531 Rutherford Road, City of Vaughan, which provide Enhanced Level Total Suspended Solids (TSS) removal.
The works consist of:
- The facility includes nine oil containment pits with individual storage capacities ranging from 2,501 L to 8,709 L of insulating transformer mineral oil. Each containment pit is equipped with a dedicated oil collection sump and sub-drainage system designed to collect and convey accumulated liquids within the containment area.
- Drainage from the site will be collected and conveyed through the proposed on-site swales to a dry pond designed to provide stormwater quantity control. The controlled discharge from the dry pond will be released through a riprap outlet located at the south property boundary. Following discharge, runoff will be conveyed via overland flow across the adjacent property before ultimately draining to Rainbow Creek.
Effets de la consultation
No comments were received during the public consultation period
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 26 août 2026 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Vaughan 3 Energy Storage 1 GP Inc. as general partner for and on behalf of Vaughan 3 Energy Storage 1 LP
161 Cityview Boulevard
Vaughan,
ON
L4H 0A9
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for Vaughan 3 Energy Storage 1 GP Inc. as general partner for and on behalf of Vaughan 3 Energy Storage 1 LP.
This application is for the establishment of sewage works infrastructure, in support of a proposed industrial development; for the collection, treatment and disposal of stormwater run-off from a site located at 6531 Rutherford Road, in the City of Vaughan, Ontario.
The proposed sewage works will consist of a dry pond designed for quantity and quality control; discharging via dry swales towards the Rainbow Creek, within the Humber River Watershed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 17 septembre 2025
au 1 novembre 2025
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0