Cette consultation se termine à 23 h 59 le :
29 octobre 2025
Résumé de la proposition
The Ministry has received an application for a new recovery permit #MR-25-04756, from First Mining Gold (“the Applicant”) for the recovery of gold bearing substances from mine waste materials resulting from historic mining. The proposed permit activities would occur at First Mining Gold’s Cameron Lake site, Rowan Lake Area, District of Kenora.
Détails de l'emplacement
Détails de l'emplacement du site
The recovery activities associated with this request for a recovery permit are located in: Rowan Lake Area, District of Kenora.
Claim numbers instructions: "To view individual claims on a map please use the Mining Lands Administration System. Click on "I want to…" and select "Find a claim" to search by claim numbers or "Find a township" to search by township.”
Mining Lease: LEA-108400
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
First Mining Gold Corp
Suite 2700, 1188 West Georgia St
Vancouver ,
BC
V6E 4A2
Canada
Détails de la proposition
First Mining Gold (the “Applicant”) has submitted an application for a new recovery permit #MR-25-04756, to the Ministry under Part VII of the Mining Act (the “Act”).
If issued, a recovery permit authorizes a permit holder to recover minerals or mineral bearing substances from tailings and/or other mine waste materials resulting from mining without first obtaining an exploration permit or filing a closure plan. If the tailings or other mine waste materials are located on Crown land, the permit holder may also recover minerals and exploit them commercially without a mining claim or lease.
The Applicant has applied for a recovery permit that would allow it to undertake the following recovery and remediation activities in accordance with the Recovery and Remediation Plan which forms part of the permit:
The objective of the Project is to remove 30,000 tonnes of ore located at the Cameron Project. This project will involve the transporting the ore to New Gold’s Rainy River mill for processing. The main activities of the project are as follows:
- load/haul ore from the existing on-site ore stockpile (approximately 30,000 tonnes)
- the use of Cameron Lake Road for access to the Project to facilitate movement of personnel, trucks for the transportation of the ore, fuel supply, excavator to and from the project
- transportation of ore to the New Gold’s Rainy River mill
Potential disturbances from the proposed activities are described as:
- small increase in daily traffic of heavy equipment on Cameron Lake Road and Highway-71
- increase in heavy equipment use at Cameron Lake site
A recovery permit does not relieve the Applicant from compliance with any other requirements that are set out under the Mining Act, its regulations, or any other Act.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Communiquer avec nous
Contact
Doug Nikkila
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Doug Nikkila
435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada