Cette consultation se termine à 23 h 59 le :
8 décembre 2025
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from 1648133 Ontario Ltd., operating as Furmar Dixie Road.
Détails de l'emplacement
Adresse du site
5830 Dixie Road
Mississauga,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
1648133 Ontario Ltd. operating as Fumar Dixie Road
5830 Dixie Road
Mississauga,
ON
L4W 1E7
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from 1648133 Ontario Ltd., operating as Furmar Dixie Road, a hot-mix asphalt plant and aggregate depot facility, located in the City of Mississauga, Ontario.
The application includes all sources at the facility, including manufacturing operations of the hot-mix asphalt plant, including aggregate receiving, storage, and transfer, asphalt cement receiving and storage, aggregate drying, hot-mix asphalt production, process heating, as well as aggregate depot processes and other related equipment. Emissions to the air from this facility include:
- particulate matter
- respirable crystalline silica (quartz)
- nitrogen oxides
- benzo(a)pyrene
- benzene
- naphthalene
- arsenic
- lead, and
- nickel
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada