Cette consultation a eu lieu :
du 21 novembre 2025
au 21 décembre 2025
Résumé de la proposition
This proposal is for the renewal of Permit to Take Water (PTTW) No. 2320-ABMRBA for Oxford Sand & Gravel Limited for industrial purposes. Water will be taken from two watercourses and one well in Norwich, Ontario.
Détails de l'emplacement
Adresse du site
594728 Highway 59
Norwich,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Oxford Sand & Gravel Limited
594728 Highway 59
Norwich,
ON
N4S 7V8
Canada
Détails de la proposition
This proposal is for a Category 1 Renewal to PTTW No. 2320-ABMRBA for Oxford Sand & Gravel Limited for industrial purposes. Water will be taken from two watercourses and one well in Norwich, Ontario. Details of the water taking are the following:
Permit Type - Renewal
Source #1- Bedrock Well
- source of water: drilled well
- purpose of water taking: industrial- ready-mix concrete manufacturing
- maximum rate per minute (litres): 300
- maximum number of hours of taking per day: 6
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 365
- earliest date of taking (mm/dd): 01/01
- latest date of taking (mm/dd): 12/31
- length of time: 10 years
Source #2- Municipal Ditch A
- source of water: municipal ditch
- purpose of water taking: industrial-aggregate washing
- maximum rate per minute (litres): 680
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 979,200
- maximum number of days of taking per year: 25
- earliest date of taking (mm/dd): 04/01
- latest date of taking (mm/dd): 06/20
- length of time: 10 years
Source #3- Municipal Ditch B
- source of water: municipal ditch
- purpose of water taking: industrial-aggregate washing
- maximum rate per minute (litres): 75
- maximum number of hours of taking per day: 13
- maximum volume per day (litres): 58,500
- maximum number of days of taking per year: 290
- earliest date of taking (mm/dd): 04/01
- latest date of taking (mm/dd): 06/20
- length of time: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 21 novembre 2025
au 21 décembre 2025