Cette consultation se termine à 23 h 59 le :
22 janvier 2026
Résumé de la proposition
This proposal is for an Environmental Compliance Approval (waste disposal site) for an enclosed non-hazardous materials transfer/processing facility, located in Barrie.
Détails de l'emplacement
Adresse du site
25 & 45 Middleton Court
Barrie,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
DS Soils Inc.
52 Fairway Court
Oro-Medonte,
ON
L0L 2L0
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval (waste disposal site) for an enclosed non-hazardous materials transfer/processing facility. This facility is on a 2.35-hectare property located in the City of Barrie, ON.
The facility is located within a new industrial subdivision and is surrounded by industrial lands. The facility will receive, store, transfer and process non-hazardous materials including dry excess soil, road sweepings and liquid soil; all storage and processing of materials will be undertaken within enclosed areas at the facility.
The facility will receive liquid soil from hydrovac vehicles from multiple sites in Ontario; dry soil is generated by physical water separation. Separated water is proposed to be reused in hydrovac activities or where necessary, managed via the local sanitary sewer system. The facility will predominantly serve as a material recycling/reuse facility; all materials will be tested to determine the appropriate reuse/ disposal site for shipment from the facility.
Materials which meet applicable criteria for beneficial reuse will be transferred to excess soil reuse sites in accordance with the requirements of Ontario Regulation 406/19. Materials received at the facility that do not meet excess soil reuse criteria will be removed from the site and disposed of by licenced haulers. The maximum quantity of waste delivered to the site on any given day is 1,000 tonnes, and 365,000 tonnes annually.
Operations at the facility may occur 24 hours a day, 365 days of the year. The facility will receive materials from the Province of Ontario.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada