Cette consultation a eu lieu :
du 12 décembre 2025
au 26 janvier 2026
Résumé de la décision
We have issued an amendment to the Environmental Compliance Approval (ECA) No. A420018 for the expansion of Landfill Gas Collection System (stages 5 and 6) of the Eastern Ontario Waste Handling Facility.
Détails de l'emplacement
Adresse du site
17125 Laflèche Road
North Stormont,
ON
Canada
Détails de l'emplacement du site
Eastern Ontario Waste Handling Facility
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
GFL Environmental Inc.
17125 Lafleche Road
North Stormont,
ON
K0C 1W0
Canada
Détails de la décision
We have issued an amendment to the Environmental Compliance Approval (ECA) No. A420018, for the expansion of the landfill gas collection system (LFGCS) into landfill stages 5 and 6 of the Eastern Ontario Waste Handling Facility (EOWHF).
The proposed stage 5 and 6 expansion will consist of vertical gas extraction wells connected to header/subheader piping to extract landfill gas (LFG) from future landfill cells. Additionally, condition 36.6 has been amended in accordance with Ontario Land Tribunal Case No. OLT-24-000579 decision, dated March 24, 2025.
Facility details are as follows: The use and operation of an 178.6 hectares landfilling site within a total site area of 189 hectares and receiving capacity of 4,000 tonnes per day, for the disposal of municipal waste including domestic, commercial, non-hazardous industrial waste, tires, leaf & yard waste, contaminated soil & wood waste.
The site has a final volumetric capacity of 18,7600,000 cubic metres, and operates Monday to Friday 7 a.m. to 6 p.m. and Saturday 8 a.m. to 5 p.m.
Effets de la consultation
No comments were received as a result of of the ERO posting.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
113 Amelia Street
1st Floor
Cornwall,
ON
K6H3P1
Canada
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 20 juillet 2026 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
GFL Environmental Inc.
17125 Lafleche Road
North Stormont,
ON
K0C 1W0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This application is for an amendment to existing Environmental Compliance Approval (ECA) No. A420018, for the expansion of the landfill gas collection system (LFGCS) into landfill stages 5 and 6 of the Eastern Ontario Waste Handling Facility (EOWHF).
The proposed stage 5 and 6 expansion will consist of vertical gas extraction wells connected to header/subheader piping to extract landfill gas (LFG) from future landfill cells. These wells/pipes would be connected to the existing LFGCS installed in stages 1-4. Additionally, condition 36.6 is to be amended with the following language: The owner shall ensure that the collected leachate is promptly removed from each landfill cell as required by Ontario Regulation 232/98. Under normal conditions (except during storm events and spring snowmelts), the leachate level within each landfill cell in stages 5 and 6 shall be kept at less than 1.5 metres over the landfill base clay surface, in according with Ontario Land Tribunal Case No. OLT-24-000579 decision, dated March 24, 2025.
Note that landfill Stages 5 and 6 waste containment design, tonnage capacity and operating procedures was the topic of a separate application to which the MECP granted approval May 15, 2024.
Facility details are as follows: The use and operation of an 178.6 hectares landfilling site within a total site area of 189 hectares and receiving capacity of 4,000 tonnes per day, for the disposal of municipal waste including domestic, commercial, non-hazardous industrial waste, tires, leaf & yard waste, contaminated soil & wood waste.
The site has a final volumetric capacity of 18,7600,000 cubic metres, and operates Monday to Friday seven a.m. to six p.m. and Saturday eight a.m. to five p.m.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 12 décembre 2025
au 26 janvier 2026
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0