Cette consultation se termine à 23 h 59 le :
12 février 2026
Résumé de la proposition
This proposal is for a renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 4427-ACPS2J for DCL International Inc., a facility manufacturing vehicle exhaust purifiers, located in the City of Vaughan, Ontario.
Détails de l'emplacement
Adresse du site
140 Cidermill Avenue
Vaughan,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
DCL International Inc.
140 Cidermill Avenue
Vaughan,
ON
L4K 4T5
Canada
Détails de la proposition
This proposal is for a renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 4427-ACPS2J for DCL International Inc., a facility manufacturing vehicle exhaust purifiers, located in the City of Vaughan, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include oxidation of metallic substrates by natural gas-fired oxidation furnaces, application of precious metal-based catalyst onto metallic substrates, drying and calcination of catalyst in drying ovens, cutting and welding of steel to form housings and mufflers for the catalyst, and laboratories for the testing of engines.
The amendment includes:
- the addition of three calcination ovens
- additional tungsten inert gas (TIG) welding activities
- alterations to the facility production limit for the amounts of litres of catalyst and parts assembled per year at the facility
Emissions to the air from this facility include:
- chromium
- chromium hexavalent
- manganese
- nickel
- nitrogen oxides
- particulate matter
- nitric acid
- zirconium oxide
- cerium oxide
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada