Update Announcement
This proposal notice was originally posted on January 7, 2026, with a 30-day public comment period ending February 6, 2026. The ministry has updated its proposal and provided a new 30-day comment period. Further details on this update are provided in the proposal details section.
Cette consultation se termine à 23 h 59 le :
13 mars 2026
Résumé de la proposition
This proposal is for an amendment to Permit to Take Water No. P-300-1087434989 Version 2.0 for Alamos Gold Inc. Water would be taken from one lake for building operations, and from 9 wells and various lakes and watercourses for exploration drilling, located 50 kilometers northeast of the Town of Wawa, Ontario.
Détails de l'emplacement
Adresse du site
15 Goudreau Road
Dubreuilville,
ON
P0S 1B0
Canada
Détails de l'emplacement du site
Approximately 50 kilometers northeast of Wawa and 14 kilometers southeast of the township of Dubreuilville, within the unorganized Finan Township and Jacobson Township, district of Algoma, Sault Ste. Marie.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Alamos Gold Inc.
15 Goudreau Road
Dubreuilville,
ON
P0S 1B0
Canada
Détails de la proposition
This proposal is for an amendment to Permit to Take Water No. P-300-1087434989 Version 2.0 for Alamos Gold Inc. Water will be taken from one lake for building operations, from 9 wells for exploration drilling purposes, and from various lakes and watercourses within 4 watersheds for exploration drilling purposes. The activities are associated with the Island Gold Mine and are located across an area approximately 50 kilometers northeast of the Town of Wawa, Ontario.
The water taking details included in the previous version of this proposal significantly overstated the maximum volumes that Alamos Gold Inc. is proposing to take, and also omitted sources for continued takings under the existing Permit to Take Water (No. P-300-1087434989 Version 2.0). Furthermore, the source names previously listed (e.g. Dog Lake) implied that water will be withdrawn only from individual waterbodies, rather than from various locations within the larger watershed (e.g. Dog Lake Watershed). This updated proposal notice reflects Alamos Gold Inc.’s proposed water taking rates and locations. The ministry is providing a new 30-day comment period associated with the updated notice of proposal.
The proposed amendment is to replace 9 lake sources on the existing Permit to Take Water (No. P-300-1087434989 Version 2.0) with 4 watershed-based sources, intended to provide operational flexibility while ensuring environmental protection consistent with all ministry standards and regulatory requirements. Strict conditions and rules are proposed to further limit the selection of locations from which water may be taken, and to govern how water is to be returned to the environment.
Details of the water taking are as follows:
Permit type – Amendment
Source Name: Goudreau Lake
- purpose: building operations
- maximum rate per minute (litres): 69.5
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Well-Bear Paw
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Well-Pine
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 244
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Unnamed Lake #1
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 121
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Tuff
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 121
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Maskinonge
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 244
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Indian
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 121
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Mall
- purpose: mining
- maximum rate per minute (litres): 146
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 244
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Well-Goudreau
- purpose: mining
- maximum rate per minute (litres): 250
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Well-Unnamed Lake #9
- purpose: mining
- maximum rate per minute (litres): 100
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 40,000
- maximum number of days of taking per year: 244
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 11/30
- period of taking: 10 years
Source Name: Dog Lake Watershed
- purpose: exploration drilling
- maximum rate per minute (litres): 347
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 500,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Manitowik Lake Watershed
- purpose: exploration drilling
- maximum rate per minute (litres): 347
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 500,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Magpie River Watershed
- purpose: exploration drilling
- maximum rate per minute (litres): 347
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 500,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Missinabi River Watershed
- purpose: exploration drilling
- maximum rate per minute (litres): 347
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 500,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada