Cette consultation se termine à 23 h 59 le :
28 février 2026
Résumé de la proposition
This proposal is to amend Environmental Compliance Approval No. 54-45-97 for the replacement of the Existing Grease Interceptor and Septic Tanks servicing Elmira Curling Club.
Détails de l'emplacement
Adresse du site
40 Eldale Road
Woolwich ,
ON
Canada
Détails de l'emplacement du site
Elmira Golf Club.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Elmira Golf Club
40 Eldale Road
P.O. Box 61
Woolwich,
ON
N3B 2Z5
Canada
Détails de la proposition
Elmira Golf Club seeks to amend Environmental Compliance Approval (ECA) No. 54-45-97, issued in 1997 under the Environmental Protection Act by the Region of Waterloo’s Community Health Department for construction of the Class 4 onsite wastewater system that services Elmira Golf Club and Elmira Curling Club (located at 40 Eldale Road in the Township of Woolwich).
Specifically, the applicant proposes to replace the existing grease interceptor and septic tanks.
The wastewater system was designed by Paragon Engineering (subsequently Stanley Consulting and now Stantec) and is comprised of a 1,000-litres grease interceptor tank, 22,000-litres septic tank, 4,141-litres effluent pump tank, and raised trench bed (sand fill area of 2,000 square metres and distribution pipe length of 500 metres).
The grease interceptor and septic tanks have reached the end of their service lives and are in a deteriorating state, and are therefore proposed to be replaced with a grease interceptor tank with a minimum effective volume of 6,000-litres and a septic tank with a minimum effective volume of 30,000 litres. The pump tank and raised bed are to be retained. The rated capacity of the wastewater system, as designed by Paragon, is 10,000 litres per day.
No building changes have occurred since issuance of the above-referenced ECA, nor are any building changes proposed in relation to the proposed tank replacements (i.e., no increase in peak wastewater flow); however, the Township of Woolwich has directed this matter to be addressed under the Ontario Water Resources Act.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada