Cette consultation a eu lieu :
du 19 janvier 2026
au 5 mars 2026
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) owned and operated by 968502 Ontario Inc. for the installation of a proposed large subsurface sewage disposal system with tertiary treatment to serve all office/ warehouse, a large garage, a greenhouse and a residential dwelling located at 1050 Canboro Road, in the Town of Pelham
Détails de l'emplacement
Adresse du site
1050 Canboro Road
Town of Pelham,
ON
L0S 1C0
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
968502 Ontario Inc.
1050 Canboro Road
Pelham,
ON
L0S 1C0
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) owned and operated by 968502 Ontario Inc. for the installation of a proposed large subsurface sewage disposal system with tertiary treatment to serve all office/ warehouse, a large garage, a greenhouse and a residential dwelling located at 1050 Canboro Road, in the Town of Pelham, Ontario.
The property is used for floral distribution operations and all sanitary sewage flows, with a total daily design flow of 23,350 liters per day, will be directed to one proposed central septic system. The existing septic beds serving different buildings will be decommissioned. Level IV tertiary treatment system, complete with a raised Type A Dispersal Bed, is proposed for all on-site floral distribution buildings.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 19 janvier 2026
au 5 mars 2026