Cette consultation se termine à 23 h 59 le :
28 février 2026
Résumé de la proposition
This proposal is for a renewal to Permit To Take Water No.1230-A8TJHP for Watch Tower Bible and Tract Society of Canada for irrigation, water supply and cooling water purposes. Water will be taken from four wells in Halton Hills, Ontario.
Détails de l'emplacement
Adresse du site
13893 Highway 7
Georgetown,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Watch Tower Bible and Tract Society of Canada
13893 Highway 7 Road
Georgetown,
ON
L7G 4S4
Canada
Détails de la proposition
This proposal is for a renewal to Permit To Take Water No.1230-A8TJHP for Watch Tower Bible and Tract Society of Canada for irrigation, water supply and cooling water purposes. Water will be taken from four wells in Halton Hills, Ontario. Details of the water taking are as follows:
Permit type - Renewal
Source name: Well #1
- purpose: facility operations, irrigation
- maximum rate per minute (litres/min): 341
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 245,520
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #2
- purpose: communal supply, water supply
- maximum rate per minute (litres/min): 246
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 177,120
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #3
- purpose: communal supply, water supply
- maximum rate per minute (litres/min): 189
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 136,080
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #4
- purpose: industrial
- maximum rate per minute (litres/min): 1,136
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,635,840
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
There are three categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada