Cette consultation a eu lieu :
du 19 mars 2026
au 3 mai 2026
Résumé de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
Détails de l'emplacement
Adresse du site
90 Becketts Side Road
Waubaushene,
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Hydro One Networks Inc.
483 Bay Street
Floor 14
Toronto,
ON
M5G 2P5
Canada
Détails de la décision
Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
On September 1, 2026, Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval.
The application is considered withdrawn, and no approval was issued. The ministry closed the file on September 4, 2026.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Hydro One Networks Inc. This application is for the approval of stormwater management works to serve the Waubaushene Transmission Station located at 90 Becketts Side Road, Waubaushene, Ontario.
The proposed stormwater management works consist of replacing the existing power transformers T5 and T6 with new transformers (3T3 and 3T4), new spill containment pits for 3T3 and 3T4, and one new oil-water separator. All clean effluent will discharge into the municipal ditch at the southwest corner of the station, with ultimate discharge into Georgian Bay.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 19 mars 2026
au 3 mai 2026
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0