Résumé de la proposition
The Ministry has accepted a risk assessment prepared for the owner, RSG Oakville Holdings Inc., based the futured mixed use development plans for the property. The Director is considering issuing a Certificate of Property Use (CPU) in relation to the property.
Détails de l'emplacement
Adresse du site
550 Kerr Street
Oakville,
ON
L6K 3C7
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
RSG Oakville Holdings Inc.
20 Maritime Ontario Boulevard
Unit 216
Brampton,
ON
L6S 0E7
Canada
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified on the property may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the following intended uses: “Residential Use”, “Parkland Use”, “Commercial Use”, “Community Use” and/or “Institutional Use”, as defined by O. Reg. 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act (the "Act").
Based on the documents provided to the Ministry as part of the risk assessment report, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents.
The Director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with s.168.5 of the Act on September 4, 2025.
The Director is considering issuing a Certificate of Property Use (CPU) in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and other conditions proposed by the Director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- property use restrictions
- maintaining a barrier to site soils
- building construction restrictions for future buildings on the property to address the soil vapour intrusion pathway
- building construction requirements to mitigate ongoing migration of contaminated groundwater off the property
- implementing an indoor air quality monitoring program, or a sub-slab vapour monitoring program
- requirement that all underground utilities be constructed in a manner so as to prevent migration of contaminants of concern within the backfilled utility trench
- restrictions on using ground water for potable purposes
- implementing a health and safety plan
- implementing a soil and ground water management plan
- reporting requirements
- requirement to provide financial assurance
The proposed draft CPU No. 2664-DLBJW5 including the Section 197 Order, is provided as a link under the Supporting Materials section of this notice.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste