Cette consultation a eu lieu :
du 11 mai 2026
au 10 juin 2026
Résumé de la proposition
This proposal is to renew Permit to Take Water No. 1631-C4MLTD for Teeswater Concrete Ltd. Water will be taken from one well, and one creek for manufacturing-water supply and aggregate washing purposes in the Municipality of South Bruce, Bruce County, Ontario.
Détails de l'emplacement
Adresse du site
1201 Bruce County Road 6
Teeswater,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
TEESWATER CONCRETE LTD.
1201 Bruce County Road 6
Teeswater,
ON
N0G 2S0
Canada
Détails de la proposition
This proposal is to renew Permit to Take Water No. 1631-C4MLTD for Teeswater Concrete Ltd. Water will be taken from one well, and one creek for industrial-manufacturing and aggregate washing purposes in the Municipality of South Bruce, Bruce County, Ontario.
Source of water: Natural Spring (Dug Well)
- purpose of taking: manufacturing-water supply
- maximum rate per minute (litres): 250
- maximum number of hours of taking per day: 14
- maximum volume per day (litres): 210,000
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
Source of water: Alps Creek
- purpose of taking: Industrial (aggregate washing)
- maximum rate per minute (litres): 5,400
- maximum number of hours of taking per day: 14
- maximum volume per day (litres): 4,536,000
- maximum number of days of taking per year: 200
- period of taking: January 1 to December 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 11 mai 2026
au 10 juin 2026