Cette consultation se termine à 23 h 59 le :
28 juin 2026
Résumé de la proposition
This proposal is for a renewal to Permit to Take Water No. 4360-ACUNG2 for G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED. Water will be taken from five ponds for mining-aggregate washing, construction-dust suppression and construction purposes, located in the Township of Leeds and The Thousand Islands, Ontario.
Détails de l'emplacement
Adresse du site
3299 County Road 32
Leeds and the Thousand Islands,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED
109 Washburn Road
Athens,
ON
K0E 1B0
Canada
Détails de la proposition
This proposal is for a renewal to Permit to Take Water No. 4360-ACUNG2 for G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED. Water will be taken from five ponds for/to mining aggregate washing, construction dust suppression and construction purposes, located in the Township of Leeds and The Thousand Islands, Ontario. Details of the water taking are as follows:
Permit type – Renewal
Source Name: Sweet’s Pit
- Purpose of Taking: Mining - Aggregate Washing
- Maximum rate per minute (litres): 1,420
- Maximum number of hours taking a day: 24
- Maximum rate per minute (litres): 2,044,800
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Sweet’s Pit (Dust Suppression)
- Purpose of Taking: Construction - Dust Suppression
- Maximum rate per minute (): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Sweet’s Pit (Construction)
- Purpose of Taking: Mining - Construction
- Maximum rate per minute (litres): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: North Settling Pond
- Purpose of Taking: Mining - Aggregate Washing
- Maximum rate per minute (litres): 5,455
- Maximum number of hours taking a day: 24
- Maximum volume per day (litres): 7,855,200
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: South Settling Pond
- Purpose of Taking: Mining - Aggregate Washing
- Maximum rate per minute (litres): 5,455
- Maximum number of hours taking a day: 24
- Maximum volume per day (litres): 7,855,200
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond A
- Purpose of Taking: Mining - Aggregate Washing
- Maximum rate per minute (litres): 5,455
- Maximum number of hours taking a day: 24
- Maximum volume per day (litres): 7,855,200
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond A (Dust Suppression)
- Purpose of Taking: Construction – Dust Suppression
- Maximum rate per minute (litres): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond A (Road Construction)
- Purpose of Taking: Mining - Construction
- Maximum rate per minute (litres): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond B
- Purpose of Taking: Mining - Aggregate Washing
- Maximum rate per minute (litres): 5,455
- Maximum number of hours taking a day: 24
- Maximum volume per day (litres): 7,855,200
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond B (Dust Suppression)
- Purpose of Taking: Mining - Dust Suppression
- Maximum rate per minute (litres): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Pond B (Road Construction)
- Purpose of Taking: Mining - Construction
- Maximum rate per minute (litres): 1,500
- Maximum number of hours taking a day: 12
- Maximum volume per day (litres): 525,000
- Maximum number of days of taking per year: 292
- Earliest calendar date of taking (mm/dd): 03/15
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada